Jan. 5th, 2014

naath: (Default)
[personal profile] naath
Busway path flooded between Fen Drayton and St Ives; looked really bad from the bus (flood gates closed). Took bus back to Fen Drayton. Ran to Oakington, at which point my foot was hurting :( and I was cold :( so took bus home. Measly 10km :(

On up side did get up in morning and go to Pilates at the gym.

Profile

Running Longer

April 2014

S M T W T F S
  123 45
6789101112
13141516171819
20212223242526
27282930   

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Sep. 25th, 2017 02:59 pm
Powered by Dreamwidth Studios